Hotpoint Fabric Care Freestanding 9kg Heat Pump Tumble Dryer with HomeWhiz
Model: C HD 94M WBS UK
2 Year Warranty
Which? Eco Buy
Smart Appliance
Product description
Look after your family's laundry with this energy-efficient Hotpoint heat pump tumble dryer in classic white. With a generous 9kg drum, it’s perfect for getting through laundry days without any fuss.
Featuring Heat Pump technology, it dries gently at lower temperatures, using up to 77% less energy* while still delivering great results.
If you’ve got pets at home, the clever PetHairCare cycle uses a gentle burst of steam to loosen fibres and reduce static – helping hair lift away and get caught in the filter, not on your clothes. Need laundry done in a hurry? FastDry tackles 5kg of clothes in just one hour. And for those delicate items that need extra care, DelicateDry uses lower heat to protect fabrics and help prevent shrinking. Plus, with the ColdGuard progamme, you can install this dryer in a garage or outbuilding, so you can make the most of your space.
Upkeep is simple too, thanks to the Easy Clean Filter – a combined lint and condenser filter built into the door for easy access. With the HomeWhiz app, you can manage your dryer straight from your phone, for even more convenience.
What's more, you can enjoy all of these thoughtful features without worrying about your electricity bills. Rated A+++ for energy efficiency, this dryer is designed to be kinder to both your clothes and your wallet.
*Compared to condenser tumble dryers of B energy class.
PetHairCare - The PetHairCare cycle uses a burst of steam to gently relax fabric fibres and reduce static, helping lift away pet hair and trap it in the filter, so your laundry comes out fresh, clean, and hair-free. It's a must-have for any pet-loving home.
ColdGuard - This programme is designed to work efficiently in temperatures as low as 0°C, allowing you to place your dryer in garages and outbuildings when space in the kitchen is limited.
FastDry - Dry an impressive 5kg of clothes in just one hour, without compromising on care - perfect for busy family life and big laundry days.
HomeWhiz - Make laundry day simple and more convenient with the HomeWhiz smart app. Start a drying cycle, customise the settings and receive progress updates all from your phone, no matter where you are, so you can keep your home running smoothly.